https://www.roothy.com.au
With the engine in place the next job was to get the gearbox bolted up. Shifting these things around on your own can be a bit of a challenge so I was glad to have Lachlan to lend a hand. The main objective with the install of the engine and gearbox has been to keep everything as stress free as possible. We had to fiddle about a bit with the cross member under the gearbox, but the box of bits that my mate Paul ‘Mr landcruiser’ had lent me meant we had it covered.